Compare

Comparison

The three GE series models side by side, plus the three facade cleaning methods (robot · drone · rope access). Use it to choose the right method for your building.

GE series

Model comparison

GE-02-2 handles standard facades; follow-up models handle difficult ones without anchors or with curves.

GE-02-2GE-02-2
01 · GE-02-2

Roller obstacle crossing

Model for Korea · improved commercial GE-02-1

Attachment · movementRoof wire hoist + twin rollers
FacadesFlat curtain wall · stone · metal panel · painted
Obstacle crossingUp to 450 mm
Capacity1,000–2,500 ㎡ / 8 h / unit
Main targetsApartments · offices · hospitals · department stores (approx. 90% of Korean facades)
GE-05In development · no photos yet
02 · GE-05

Suction premium

Development due 4Q 2026

Attachment · movementNegative-pressure suction (1,200 N) + omni wheels
Facades0–90° slopes · overhangs
Obstacle crossing—
Capacity—
Main targetsBuildings where roof anchors are difficult
GE-06In development · no photos yet
03 · GE-06

Freeform curves

Development due 4Q 2026

Attachment · movementFlexible jointed frame + curve-following tracks
Facades3D curves · domes · atriums
Obstacle crossing—
Capacity—
Main targetsCurved landmarks · large public facilities

GE-02-2 figures are based on the published specs of the commercial GE-02-1 and will be updated when final specs are released. GE-05 and GE-06 are based on manufacturer development plans. “—” means not yet disclosed; timelines and specs may change.

Method

Cleaning methods

How the same facade compares when cleaned by robot, drone or rope access. Drones suit low-rise buildings; robots suit mid- to high-rise curtain walls.

Smart Exterior Care · Three methods compared

Same facade, three methods — very different results

Our flagship
GE-02-1Facade cleaning robot cleaning in contact with a curtain wall
Facade cleaning robotWall-contact high-pressure cleaning
Rotating brush + high-pressure water + squeegee
Commercial cleaning droneAirborne non-contact cleaning
Sprays water/foam from 1–2 m away
Manual rope accessRope-dependent manual work
Worker on rope + brush/pressure gun
Average cleanlinessScore out of 100
95+
70–80
90–95
Robot leadsFar stronger cleaning than drones · consistent quality vs. manual
Inspection pass rateTier-1 buildings
90~98%
50~65%
80~90%
Robot winsSqueegee and suction finish minimise rework and claims
Wind resistanceUrban high-rise gusts
Very high
Very weak · stops at 5–8 m/s
Weak · banned at 8–10 m/s or rain
Robot winsFewer weather limits mean more working days per year
Work safetyFalls · serious accidents
Best · zero workers at height
Medium · risk of drone fall/damage
Very weak · risk of rope falls
Robot winsAddresses serious-accident law and on-site safety risks
Max working heightScalability
40+ floors · no floor limit
16–17 floors · approx. 50 m
No limit · riskier the higher you go
Best at every heightOvercomes both the height limit of drones and the safety limit of manual work

Bar scale is 40–100. Source: our “Smart Exterior Care — comparison of three methods” (2026-11). Cleanliness and pass rates are estimates based on industry data and manufacturer cases, to be updated after on-site pilots (PoC) in Korea.

Show detailed comparison table
ItemFacade cleaning robot (GE-02-2)Commercial droneRope access (rope seat)
Cleaning methodWall contact — rotating brush + water spray + squeegeeNon-contact spray from 1–2 mWorkers hang and clean by hand
Working height40+ floors (roof-mounted · wire)Mainly approx. 50 m in Korea (16–17 floors)No limit — riskier the higher you go
Speedapprox. 180 ㎡/h per unitFast (low-rise · simple surfaces)approx. 140 ㎡/h with 6 workers [est.]
Finish qualitySqueegee removes water in one passPossible rework for water spots after drying [est.]Varies with skill
Wind · nightWall contact and wire anchoring withstand strong windFlights stop above 5–8 m/sNo work in strong wind or at night
Workers at height0 — ground remote control0 — ground pilotedDeployed at height — fall risk
Setup · mobilityRequires roof-mounted setupTakes off immediately from the ground — drone advantageRope-seat rigging and removal

Drone and rope-access figures are based on industry information and our competitiveness analysis; [est.] marks values not yet measured. Calculate time and cost for your building in the Cost Simulator.

Contact Us →