Simulator · GE-02-2

Cost Simulator

Set the facade area, floors, wall type and number of GE-02-2 units to instantly compare time and costwith manual labour and drones.

QUICK STARTQuick presets by building size

Click to fill in real-world reference values
STEP 1Site conditions & equipmentResults update instantly as you move the sliders.
㎡
500㎡15,000㎡30,000㎡60,000㎡
28 floors (approx. 92 m)
5 F17 F (drone limit 50 m)40 F60 F
4 units deployed
1 unit3 units6 units10 units (large complex)
Based on 6 skilled workers
STEP 2Simulation resultsRecalculated instantly when conditions change · estimates
GE-02-2 estimated total timeEstimate

2.1 days

16.7 h of work in total (4 units)
Saved vs. rope access-81% shorter

8.6 days saved

10.7 days with 6 manual workers
Serious-accident law indicatorFact

0 workers at height

Removes 514 person-hours of rope exposure

Total duration (days) and site feasibility by method

Based on conservative net operating productivity
GE-02-22.1 days (16.7 h)

※ Based on 1,440 ㎡/8 h actual operation, after deducting setup, retrieval and water supply from the manufacturer's 1,000–2,500 ㎡/8 h

Manual labour (rope-seat crew)10.7 days (85.7 h)

※ Protruding/uneven facade: 1.7× longer than flat surfaces for avoiding obstacles and re-rigging ropes

Detailed calculation basis

ItemGE-02-2Manual labour (rope access)
Deployment4 units deployed6 skilled rope workers
Total area per hour720 ㎡/h (180 ㎡/h per unit)140 ㎡/h (uneven-wall delay included)
Daily operating hours8 h/day (standard day shift)8 h/day (daytime only, no night work)
Estimated completionapprox. 2.1 days (16.7 h)approx. 10.7 days (85.7 h)
Finish quality · safetyTwin roller + squeegee finish / 0 at heightManual finish / fall and serious-accident risk